§ 53.34. CALCULATION OF CHARGES; DETERMINATION OF SHARE; ANNUAL PAYMENT.  


Latest version.
  • (A) The industrial cost recovery charge for each industrial user shall be a portion of the federal construction grant amount equal in proportion to the industrial share of the total capacity of the system in terms of strength, volume, and delivery flow rate. Specifically, the industrial share of the total capacity shall be determined by one of the three following relationships, whichever produces the largest value:
    (1) Industrial volume contribution per unit of time - plant design volume per unit of time;
    (2) Industrial BOD contribution per unit of time - plant BOD design capacity per unit of time; and
    (3) Industrial suspended solids contribution per unit of time - plant suspended solids design capacity per unit of time.
    (B) Industrial cost recovery charges shall be calculated and paid annually in an amount equal to the total industrial cost recovery charge for any industrial user divided by the number of years in the cost recovery period.
    (1995 Code, § 58-535) (Ord. 60, passed 4-2-1979)