Douglas |
Code of Ordinances |
Title V. PUBLIC WORKS |
Chapter 53. SEWER USE |
INDUSTRIAL COST RECOVERY SYSTEM |
§ 53.33. INDUSTRIAL COST RECOVERY PERIOD.
Latest version.
- The industrial cost recovery period is the time period that is provided to allow industrial users to pay their total industrial cost recovery charge. The period of time shall be equal to 30 years or the useful life of the system, whichever is less, as determined by the Authority.(1995 Code, § 58-534) (Ord. 60, passed 4-2-1979)